en-USfa-IR
 
Road and TransportationRoad Construction & TunnelConstruction of second lot of the second lane of the Bafgh-Yazd

Subject: Construction of second lot of the second lane of the Bafgh-Yazd highway

Place of execution: Yazd Province, between the Fahraj village and railway crossing

Client: General Direction of Roads and Transportation of the Province of Yazd

Consultant: Consulting engineers Tarh Afarinan Pars

Description: Construction of second lot, to the length of 40 km, with the operations of execution and embankment of 1,000,000 cubic meters of asphalt and excavation to the order of 200,000 tons.

Visit 1075

All Rights Reserved - Designed by : ModernDesign.ir 2015