en-USfa-IR
 
Road and TransportationRoad Construction & TunnelConstruction of replaced road of the dam Mamloo

Subject: Construction of replaced road of the dam Mamloo toward the Shahid Babaei, Partchine highway

Place of execution: Province of Tehran

Client: Ministry of Energy

Consultant: Consulting engineers Omran Iran

Description: Modification and diversion of Shahid Babaei, Partchine highway to the length of 8 km to the length of 7.2 km and construction of the tunnel with the entry of 13 meters, length 800 meters, with the operations of excavation and embankment of 2,100,000 cubic meters of asphalt and execution to the order of 25,000 tons

Visit 888

All Rights Reserved - Designed by : ModernDesign.ir 2015